Welcome to our case studies. A brief archive of the projects we’ve recently worked on.
These are all short accounts detailing the clients we work with, the type of projects we worked on, the services we provided and and how we’ve saved our clients time and money.
Send us your plans to see how we can make your next project easier.
Get In TouchEmpire
C80 Solutions has worked with Empire on a variety of property developments including Globe Works in Bolton, Churchside in Wolverhampton and Consort House in Doncaster.
"Over the past few years, I've worked very closely with C80’s team on a professional level. The service they offer is fast and to a very high standard."
Hollie Arrowsmith
Kier Living
The client was in need of the as built SAPs and EPCs quickly to obtain the completion certificate from Building Control. We managed to turn around the SAPs and EPCs in 24 hours.
"C80 are very helpful, efficient and professional with fantastic turnaround times on SAP calculations and EPCs. We wouldn't hesitate to recommend them."
SAM LYSIAK, TECHNICAL CO-ORDINATOR, KIER
Former Throckley School Site, Throckley
Keepmoat
During the assessment we advised the client to remove certain items from their code specification saving them over £1000 per plot whist still achieving the required code level.
"C80 Solutions have been my go to company for Code Assessments for many years now. I would recommend C80 Solutions to anyone without hesitation."
CHRIS WARDELL, DEVELOPMENT COORDINATOR, KEEPMOAT
Lovell Partnerships
We removed the need to fit Solar PV tiles on all phase 2 plots (66 plots in total) by improving the fabric specification and therefore saved the client in the region of £150,000.
"We found C80 to be very professional, efficient and knowledgeable and we look forward to working with the Company on future developments."
ADAM COCKROFT, DEVELOPMENT CO-ORDINATOR, LOVELL PARTNERSHIPS LTD
We attended design team meetings and worked closely with the design team to achieve the most cost effective build specification. ... read more
Due to project timescales, dwellings weren't reaching the required code level. We dealt with this issue for the client and advised on the most cost effective solution to achieve sufficient credits. ... read more
New Residential Tower, Scarbrook Road, Croydon
As part of our instruction we helped design the most cost effective solution to achieve the 40% on-site CO2 reduction target set by the London Plan. ... read more
The client was let down by their previous assessor and were in need of the as built SAPs and EPCs quickly to obtain the completion certificate from Building Control. ... read more
We completed all the SAP Calculations in 1 week to achieve the clients deadline. We carried out numerous revisions of the calculations until the desired results were achieved. ... read more
Northbourne Street, Newcastle upon Tyne
The initial building specification didn't comply with Part L of building regulations. We provided free specification guidance that achieved compliance in the cheapest way possible. ... read more
We completed all the SAP Calculations in 4 days to achieve the clients deadline. ... read more
We provided specification advice to achieve Part L compliance on this block of flats. ... read more
We completed all the SAP Calculations in 3 working days to meet the clients deadline. ... read more
We worked closely with the M&E Engineer to establish the most cost effective heating and hot water solution for the development. ... read more
We saved the client £250,000 by producing a report that showed how the energy reduction target could be met by a fabric first principle, thereby removing the need for any costly renewable technologies. ... read more
We reduced the amount of PV required by 20kwp by making fabric improvements, including MVHR and reducing the air test target, therefore saving the client £30,000. ... read more
We produced a number of free sample SAP Calculations to ensure the proposed building specification was compliant with Building Regulations. Once the specification was finalised quickly delivered the SAP Calculations ... read more
We have carried out 82 SAP Calculations on extension projects for this particular client over a period of 4 years with a 100% success rate. ... read more